Roof Replacement & Full Tear-Off

Monroe GA Gainesville FL Raleigh NC

Most of a replacement is decided on the morning of the tear-off

Most of a roof replacement gets settled on one morning, and it is not the morning the contract is signed. It is the morning the old covering comes off and the decking is visible for the first time in twenty or thirty years. Everything before that is a well-informed reading of a roof through its shingles. Everything after it is a job whose scope is finally known. A good proposal is written with that gap in mind, and a bad one pretends the gap is not there.

JKey has worked in the construction industry for over 20 years and runs its roofing division from Monroe, Georgia, Gainesville, Florida, and Raleigh, North Carolina. What follows is the replacement project itself: what happens, in what order, what can change once the roof is open, and how the paperwork should handle the part nobody can see yet. Whether a roof needs replacing at all is a different question, and the residential roofing page works through it.

The unknown The deck

Nothing else on a roof stays hidden until the covering is off.

Georgia license RLQA004595

Held for residential and light commercial work.

Florida license CCC1335303

Certified roofing contractor, State of Florida.

Permitted Locally

Walton, Alachua and Wake counties and the cities inside them each set their own requirements.

Tear off or recover, and what each one costs later

A recover lays a new covering over the one that is already there. It skips the tear-off, the dumpster and a day of labour, and on paper it looks like the same roof for less work. What it actually skips is the only opportunity anyone gets to look at the decking, which means the new roof is installed over an assumption.

Layer count settles it before preference does. Jurisdictions limit how many roof coverings a structure may carry, and a roof already holding two is not a candidate regardless of how sound it is. Even where a recover is allowed, the second layer adds weight, holds heat against the new shingles, and forces every fastener to find the deck through twice the material. The next replacement then starts as a two-layer tear-off, which is slower and produces more debris than the one that was avoided.

None of that makes a recover wrong in every case. A single sound layer on a simple roof, over decking that has been genuinely verified rather than assumed, is a defensible piece of building. The mistake is choosing a recover to avoid finding out what the deck is doing. That information does not stop being true because nobody looked at it.

The decking is the one thing nobody can price in advance

Most of a roof can be read before the job starts. The covering is visible, the pitch and the planes can be measured off a ladder, and the exposed leg of every flashing can be looked at. Two things cannot be seen at all. One is the decking. The other is the part of a step flashing that sits behind the siding, which is why sealant smeared across an exposed leg tells you almost nothing about the lap underneath it. The deck is the larger of the two unknowns, because it is the surface everything else is fastened to. An attic inspection narrows the range, since staining, daylight at a penetration and sheathing that flexes underfoot all tell you something, but it narrows it rather than settles it. Insulation, ductwork and finished ceilings hide most of the underside of a typical roof.

What turns up after a tear-off is usually local rather than general. Rot concentrates where water has been getting in for a while, so it clusters around plumbing boots, in valleys, along the eave and at the chimney. Older homes with plank decking bring a second question, since board spacing and split boards both affect whether a modern covering can be fastened to it properly. Panel decking fails differently. Plywood separates at the plies, and OSB swells at the panel edges and never comes back down once it dries, and in both cases sheathing that no longer holds a nail has to come out whether it looks bad or not.

This is why the decking language in a proposal matters more than almost anything else in it. The proposal should say what it assumes about the deck, state a unit rate for replacing sheathing if the assumption is wrong, name who makes that call on site, and commit to photographs of anything replaced before new material covers it. A proposal that is silent on decking is not a cheaper job. It is the same job with the conversation postponed to the worst possible moment, which is the middle of a tear-off with the house open.

The same roof is a different project in Florida than in Georgia

Roofing is permitted and inspected locally, and the two states JKey holds licenses in write the rules differently. Georgia work runs on the state minimum standard codes, enforced locally, and in Walton County a replacement is a permitted job with inspections attached. A house inside Monroe city limits is permitted by the city rather than the county, which is the ordinary arrangement anywhere a building sits inside an incorporated municipality. Florida adds requirements that simply do not attach in Georgia, and they change the scope rather than the paperwork.

Three of those differences show up on nearly every Florida replacement, and only two of them happen on the roof. The fastening of the deck has to be brought up to the current schedule once the old covering is off, which is real work on a house built to an older standard. A secondary water barrier goes over the deck, so that the roof still resists water if the covering above it is lost in a storm. The third is settled before anyone climbs a ladder, because the assembly has to carry a product approval for the wind zone the building sits in, and that constrains what can be specified long before anyone gets to preferences.

The practical effect is that a Florida replacement front-loads more work into the stage between tear-off and covering. In Gainesville the dry-in is an inspected condition the roof has to pass before shingles go on. That is worth knowing when two proposals from two states appear to describe the same job at different scopes. They are not describing the same job. The code, not the contractor, is what put the extra items in one of them.

How the work happens

6 stages
01 Assess The roof from above and the deck from inside the attic. Age, layer count, pitch, the number of planes and penetrations, and the condition of every flashing are established before a scope exists.
02 Scope What comes off, what goes back on, and what happens if the decking is not sound. The unknowns get named here with a rate attached, because naming them later is a negotiation in the middle of an open roof.
03 Permit Pulled for the jurisdiction the building sits in, which is why a house inside Monroe city limits is not permitted the same way as one out in Alachua County. The permit is what brings an inspector, and the inspector is who checks the layer nobody will ever see again.
04 Tear off The old covering comes off to the deck and the structure is visible with nothing on it. Bad sheathing gets cut out and replaced now, photographed as it goes, because this is the last moment it is reachable. On a Florida job the deck is also refastened to the current schedule while it is still bare.
05 Dry in A secondary water barrier where Florida requires one, then underlayment, drip edge and flashings. The dry-in is what makes the roof watertight, and it is the stage an inspector actually looks at.
06 Install Covering, ridge, penetrations and trim, then a magnetic sweep of the ground and a final inspection with the jurisdiction that issued the permit.

Frequently Asked Questions

How long does a roof replacement take?

It depends on the roof rather than the calendar, and the driver is complexity rather than area. A simple gable with one layer coming off moves quickly. Six planes, three valleys and two layers over plank decking take substantially longer, and deck repairs add time that cannot be scheduled in advance because the need for them is not known in advance. What does not flex is the sequencing. A tear-off is broken into sections so that no more of the roof is opened than can be closed up again, which is a second reason a complicated roof takes longer than its area suggests.

What happens if it rains in the middle of the job?

Nothing should get left open. Tear-off is sequenced in sections precisely so the roof can be closed up at short notice, and any section that gets opened should be dried in rather than covered with a tarp against a hopeful forecast. Summer afternoon storms in Georgia and north central Florida are frequent enough that planning around them is ordinary practice rather than an exception.

What happens if the decking turns out to be bad?

It gets replaced, and the only question that matters is whether you agreed on how beforehand. Ask for a per-sheet or per-board rate in the proposal, ask who makes the call on site, and ask for photographs of what was removed. Handled that way, bad decking is a line item. Handled the other way, it's a conversation about money with your house open to the sky, and that's a bad position for everyone standing in it.

Can the new roof go over the existing shingles?

Sometimes, and layer count decides it before preference does. A structure already carrying two coverings is out regardless of how sound they are. Where a second layer is allowed, it changes the roof it is added to, because the extra material holds heat against the new shingles and every fastener has to find the deck through twice the depth. The next replacement then begins as a two-layer tear-off. A recover also hides the decking, so anything wrong underneath stays wrong and stays invisible until that tear-off finds it. The honest version of this conversation starts with what the deck is doing, not with what the tear-off would have cost.

Do the vents and skylights get dealt with at the same time?

They should at least be discussed, because a replacement is the easiest time in the roof's life to touch any of them. Plumbing boots and pipe flashings are replaced rather than reused as a matter of course, since the rubber collar wears out faster than the covering around it. Skylights are the item people regret, as reflashing an old unit into a new roof preserves a seal that was already near the end of its life.

Why does a Florida replacement involve more than the same roof in Georgia?

The Florida Building Code is stricter on three things. Two of them live between the tear-off and the covering: how the deck is fastened, and whether a secondary water barrier is required. The third is settled before the job starts, because the assembly has to carry an approval for the wind zone the building sits in. Those requirements attach to the work, so they show up as scope on a Florida proposal and not on a Georgia one for an identical house. It is not a contractor preference and it is not negotiable at the inspection.